Top

Traffic Diversions At SBI Tellapur For 25 Days From August 22

Cyberabad traffic police announced diversions at SBI Tellapur from August 22 for 25 days to facilitate storm-water drain construction on Nallagandla-Tellapur Road.

Cyberabad traffic police announced diversions for motorists at SBI Tellapur from Saturday to facilitate the construction of a storm-water drain with an RCC pipeline between SBI Bank and MM Wine Mart on Nallagandla-Tellapur Road. The stretch in Tellapur Ward No. 263, Patancheru Circle-46, SLP Zone, CMC, is identified as a vulnerable waterlogging point during heavy rainfall, with water accumulation at SBI Tellapur affecting road users and traffic flow.

As part of the work, one-way traffic at SBI Tellapur will be completely closed for 25 days. Traffic between SBI Tellapur U-turn and MM Wines U-turn will be regulated on the opposite side of the road, with necessary measures at surrounding roads and junctions.

Traffic from Nallagandla circle towards Tellapur, Osmannagar and ORR Exit-2 via SBI Tellapur will use the available opposite side for about 300 metres. Commuters travelling towards Kollur and Osmannagar can alternatively take Nallagandla Circle followed by Neo Mall, Gopanpally crossroads, Aliens Junction, Osmannagar, ORR service road and Kollur.

Traffic from Tellapur circle towards RC Puram via Nallagandla will use the opposite available side for about 300 metres. Vehicles heading to RC Puram can alternatively take Tellapur circle, then towards Saibaba Temple, Railway underbridge, Old MIG reaching RC Puram.

Vehicles from Kollur and Osmannagar towards Gachibowli via Nallagandla can use the opposite side near SBI Tellapur. Alternatively, commuters can take the Kollur road towards Osmannagar, Aliens Junction, My Home Sayuk, Gopanpally junction, Gowlidoddy, Wipro circle and reach Gachibowli.

( Source : Deccan Chronicle )
Next Story